Annual Sidewalk Rehabilitation Program: Phase 11

  • Project typeCIP
  • Project value22000
  • Project scheduleMarch 2026 – April 2026
  • Contractor nameSpektren Engineering
  • Completion DateApril 30, 2026
sidewalk-rehab-poster.jpg

The City of Albany’s Annual Sidewalk Rehabilitation Program (CIP No. 22000) was established after the passage of Measure P1 in 2016 and with current funding from Measure C (2024). Project scopes are determined according to prioritization criteria reviewed by the Transportation Commission, which was updated in April 2024 and includes special access needs, unsafe sidewalks, and sidewalks posing accessibility concerns that were identified during a comprehensive, Citywide survey in 2021. This prioritization utilizes the 2021 survey for a data-driven approach so that repair locations may provide the most benefit to the community at large.

The contractor for the Project, Spektren Engineering, is scheduled to begin work on March 13, 2026. Sidewalk repair is located at various locations around the City and consists of concrete removal, concrete repair, and as-needed tree work, such as root pruning.